Students Passed
Average Marks
Questions from this dumps
Total Questions
CompTIA PK0-004 Dumps
Dumps4download providing 100% reliable Exam dumps that are verified by experts panel. Our Dumps4download PK0-004 study material are totally unique and exam questions are valid all over the world. By using our PK0-004 dumps we assure you that you will pass your exam on first attempt. You can easily score more than 97%.
100% exam passing Guarantee on your purchased exams.
100% money back guarantee if you will not clear your exam.
CompTIA PK0-004 Practice Test Helps You Turn Dreams To Reality!
IT Professionals from every sector are looking up certifications to boost their careers. CompTIA being the leader certification provider earns the most demand in the industry.
The CompTIA Certification is your short-cut to an ever-growing success. In the process, Dumps4download is your strongest coordinator, providing you with the best PK0-004 Dumps PDF as well as Online Test Engine. Let’s steer your career to a more stable future with interactive and effective PK0-004 Practice Exam Dumps.
Many of our customers are already excelling in their careers after achieving their goals with our help. You can too be a part of that specialized bunch with a little push in the right direction. Let us help you tread the heights of success.
Apply for the PK0-004 Exam right away so you can get certified by using our CompTIA Dumps.
Bulk Exams Package
2 Exams Files
10% off
- 2 Different Exams
- Latest and Most Up-todate Dumps
- Free 3 Months Updates
- Exam Passing Guarantee
- Secure Payment
- Privacy Protection
3 Exams Files
15% off
- 3 Different Exams
- Latest and Most Up-todate Dumps
- Free 3 Months Updates
- Exam Passing Guarantee
- Secure Payment
- Privacy Protection
5 Exams Files
20% off
- 5 Different Exams
- Latest and Most Up-todate Dumps
- Free 3 Months Updates
- Exam Passing Guarantee
- Secure Payment
- Privacy Protection
10 Exams Files
25% off
- 10 Different Exams
- Latest and Most Up-todate Dumps
- Free 3 Months Updates
- Exam Passing Guarantee
- Secure Payment
- Privacy Protection
Dumps4download Leads You To A 100% Success in First Attempt!
Our PK0-004 Dumps PDF is intended to meet the requirements of the most suitable method for exam preparation. We especially hired a team of experts to make sure you get the latest and compliant PK0-004 Practice Test Questions Answers. These questions are been selected according to the most relevance as well as the highest possibility of appearing in the exam. So, you can be sure of your success in the first attempt.
Interactive & Effective PK0-004 Dumps PDF + Online Test Engine
Aside from our CompTIA PK0-004 Dumps PDF, we invest in your best practice through Online Test Engine. They are designed to reflect the actual exam format covering each topic of your exam. Also, with our interactive interface focusing on the exam preparation is easier than ever. With an easy-to-understand, interactive and effective study material assisting you there is nothing that could go wrong. We are 100% sure that our PK0-004 Questions Answers Practice Exam is the best choice you can make to pass the exam with top score.
How Dumps4download Creates Better Opportunities for You!
Dumps4download knows how hard it is for you to beat this tough CompTIA Exam terms and concepts. That is why to ease your preparation we offer the best possible training tactics we know best. Online Test Engine provides you an exam-like environment and PDF helps you take your study guide wherever you are. Best of all, you can download PK0-004 Dumps PDF easily or better print it. For the purpose of getting concepts across as easily as possible, we have used simple language. Adding explanations at the end of the PK0-004 Questions and Answers Practice Test we ensure nothing slips your grasp.
The exam stimulation is 100 times better than any other test material you would encounter. Besides, if you are troubled with anything concerning CompTIA Project + Exam or the PK0-004 Dumps PDF, our 24/7 active team is quick to respond. So, leave us a message and your problem will be solved in a few minutes.
Get an Absolutely Free Demo Today!
Dumps4download offers an absolutely free demo version to test the product with sample features before actually buying it. This shows our concern for your best experience. Once you are thoroughly satisfied with the demo you can get the CompTIA Project + Practice Test Questions instantly.
24/7 Online Support – Anytime, Anywhere
Have a question? You can contact us anytime, anywhere. Our 24/7 Online Support makes sure you have absolutely no problem accessing or using CompTIA Project + Practice Exam Dumps. What’s more, Dumps4download is mobile compatible so you can access the site without having to log in to your Laptop or PC.
Features to use Dumps4download PK0-004 Dumps:
- Thousands of satisfied customers.
- Good grades are 100% guaranteed.
- 100% verified by Experts panel.
- Up to date exam data.
- Dumps4download data is 100% trustworthy.
- Passing ratio more than 99%
- 100% money back guarantee.
CompTIA PK0-004 Frequently Asked Questions
CompTIA PK0-004 Sample Questions
Question # 1
Upon assignment to a project, the project manager is given a set budget, a due date, and a clearly defined description of desired deliverables. Which of the following should the project manager do NEXT?
A. Determine the flexibility between the project constraints
B. Hold a kick-off meeting with the project team
C. Determine procurement needs to meet the project demands
D. Create the risk register
Question # 2
Analogous estimating was used earlier in a hauling project; however, through progressive elaboration, it is determined that the cost for fuel is much lower than anticipated. Which of the following types of project change should be submitted?
A. Resources
B. Requirements
C. Scope
D. Funding
Question # 3
A project manager has taken over a project that is already in progress. The project manager notices the functional manager of one team is unaware of the current progress. Which of the following should the project manager do? (Choose two.)
A. Update the project charter to include the functional manager as a key stakeholder
B. Publish the project schedule to the functional manager
C. Review the communications plan to ensure proper involvement
D. Add the incident to the issue log and seek resolution
E. Ensure the functional manager is on the status report distribution list
Question # 4
A hurricane occurs in an area where several key project resources are located. When reviewing the project dashboard, the project sponsor sees the project is behind schedule and asks the project manager for an explanation. Which of the following documents should the project manager examine NEXT to provide an explanation?
A. Meeting minutes
B. Issue log
C. Project schedule
D. Budget
Question # 5
A project manager is assigned a project that is part of the company’s strategic objectives. Of which of the following is the project a part?
A. Project management office
B. Portfolio
C. Program
D. Mission statement
Question # 6
A project manager is starting a project on an unfamiliar technology. The document that is MOST likely to be created and distributed is an:
A. RTM
B. RFQ
C. RFI
D. RFP
Question # 7
Risk ID 2 has occurred.Which of the following ways should the project manager update the risk register?
A. Add a column for probability and set risk 2 at 100%
B. Change the risk 2 response to backups restored
C. Change the risk 2 status to issue
D. Change the risk 2 owner to PM
Question # 8
A project team is working on a project with high public visibility and excitement. The project sponsor is concerned the public may lose interest due to the long delivery timeline. Which of the following is the BEST way to keep the external stakeholders informed and engaged throughout the project?
A. Video conferencing
B. Instant messaging
C. Social media
D. Email
Question # 9
Which of the following represents the order of the team development stages?
A. Forming, storming, norming, performing
B. Forming, performing, storming, norming
C. Forming, norming, storming, performing
D. Forming, norming, performing, storming
Question # 10
Which of the following should a project manager consider as part of a make or buy analysis?
A. Organization type
B. KPIs
C. Project charter
D. Trade secrets
Question # 11
A project has been experiencing some difficulties due to third-party vendors. The project manager should request.
A. Additional resources
B. A gate review
C. A risk register update
D. A performance audit
Question # 12
Which of the following are characteristics of a matrix organization? (Choose three.)
A. The project manager has full authority.
B. Resources report directly to the functional manager.
C. Authority is shared between functional and project managers.
D. Resources are assigned from functional area to project.
E. There is ad hoc resourcing.
F. The organization utilizes a bench.
G. The project manager authority ranges from strong to weak.
Question # 13
Which of the following organizational structures uses project team members who are selected from within their department?
A. Projectized
B. Balanced matrix
C. Functional
D. Strong matrix
Question # 14
The PMO has asked the PM to provide a status report indicating the number of events and activities required to complete a project. Which of the following charts should the PM include in the status report?
A. Gantt chart
B. Scatter chart
C. Run chart
D. Process diagram
Question # 15
Which of the following is a risk strategy?
A. Risk quantification
B. Risk avoidance
C. Risk identification
D. Risk review
Question # 16
A project sponsor approved an undocumented change without following the formal change control process. The resulting change caused an outage in a crucial accounting application. Which of the following change control processes would help mitigate the realization of this risk?
A. Regression plan
B. Quality plan
C. Change validation
D. Application version control
Question # 17
A key team member found a new job and will be leaving in two weeks. Which of the following should the project manager do FIRST to minimize negative impacts to the project?
A. Request a replacement from the project sponsor.
B. Contact human resources to initiate the termination process.
C. Involve the legal department for contract review.
D. Inform executive management about attrition.
Question # 18
A key stakeholder claims to have not received status updates per the agreement. The PM reviews the communications plan and determines the updates were provided as agreed upon. Which of the following should the PM do NEXT to resolve the inconsistency between the communications plan and the stakeholder’s expectations?
A. Analyze the RASI chart
B. Review previous meeting minutes.
C. Initiate a change control request.
D. Updates the communications plan.
Question # 19
Which of the following are the components of a RACI matrix?
A. Responsibility, authority, support, inform
B. Responsible, accountable, consulted, informed
C. Reliability, accountability, support, inform
D. Responsibility, acquired, consulted, informed
Question # 20
The supervisor asks an engineer to be a project manager within the department. Of which of the following types of organizational structures is this an example?
A. Projectized
B. Functional
C. Matrix
D. Intermediary
Question # 21
A PM has a complex project that requires coordination among numerous stakeholders. Which of the following is the MOST appropriate type of meeting for the stakeholders to hold?
A. Virtual
B. Impromptu
C. One-on-one
D. In-person
Question # 22
A client has requested a project be completed ahead of schedule. The client understands the triple constraints and agrees to expand the defect tolerance.Which of the following should the PM do NEXT?
A. Crash the schedule
B. Notify the project team.
C. Initiate a change request
D. Accept the risk.
Question # 23
Which of the following is the MOST important component against which the project manager can analyze project performance?
A. Burn rate
B. Project baselines
C. KPIs
D. Budget
Question # 24
Which of the following organization types requires the project manager to report performance issues to another department?
A. Functional
B. Strong matrix
C. Projectized
D. Weak matrix
Question # 25
A project manager creates a Pareto chart based on the table below: Which of the following describes why the team was asked to inspect and review missing parts, poor adhesives, and faulty installation?
A. To take preventive action and identify the causes resulting in the highest number of issues
B. To take corrective action and identify the effects resulting in the highest number of issues
C. To take preventive action and identify and frequencies resulting in the highest number of issues
D. To take corrective action and identify the causes resulting in the highest number of issues
Question # 26
A developer is experiencing constant project scope changes and reaches out to the project manager to discuss the situation. They agree the customer has requested multiple modifications to the core idea and now extra work may need to be performed. Which of the following approaches would BEST support on-time delivery considering these changes?
A. Strict change management controls
B. Regular Scrum meetings
C. Continuous requirements gathering
D. Regular milestone reviews
Question # 27
Due to a lack of adherence to the risk response plan, there are numerous safety concerns within the scope of a building project. Which of the following MOST likely explains this issue?
A. Risks were not identified.
B. Risks were not mitigated.
C. Risks were not exploited.
D. Risks were not communicated.
Question # 28
A project manager notices a lack of meeting attendance from the project team. Which of the following actions might the project manager take to BEST improve the level of attendance?
A. Schedule the meeting directly on the attendees’ calendars.
B. Publish an agenda prior to the meeting.
C. Increase the number of email invitations for the upcoming meeting.
D. Send the meeting invitation by email with a read receipt.
Question # 29
A project team has just finished one phase of product development and is gathering requirements for the next phase. Which of the following methodologies is being applied?
A. Waterfall
B. PRINCE2
C. Agile
D. Top-down
Question # 30
Team members in a projectized organization are released at the end of a project and placed on the “bench”. Which of the following should the benched team members do NEXT?
A. Find a new project.
B .Check in with a functional manager.
C. Report to the project manager.
D. Contact the project sponsor.
Question # 31
Which of the following resources outlines consequences of non-performance?
A. Project sponsor
B. Project team
C. Customer
D. Project management office
Question # 32
Which of the following tasks are responsibilities of the project manager role?
A. Provide inputs, estimate tasks, and manage a team
B. Manage the budget, perform quality assurance, and be accountable for artifacts
C. Set deliverables, control risk, manage risk, and create a project charter
D. Manage a team, marketing, roadblocks, and project steering
Question # 33
A project task has been completed ahead of schedule. Which of the following is the MOST appropriate next step?
A. Provide the next task to the newly freed resource.
B. Communicate the success to the team.
C. Notify the project sponsor of the new completion date.
D. Update the schedule and add lag to the next task.
Question # 34
An organization is divided into three separate entities based on geographical region. Which of the following types of organizational change is this?
A. Relocation
B. Outsourcing
C. Demerger
D. Split
Question # 35
When developing a project schedule, which of the following resources is the BEST to estimate task duration?
A. Project manager
B. Project scheduler
C. Project team
D. Project sponsor
Question # 36
During a risk review session, the project team identified the percentage probability that a particular risk will occur. This is known as:
A. risk identification
B. risk prioritization
C. risk qualification
D. risk quantification
Question # 37
Which of the following can a project manager use to keep track of finances and ensure costs are accurately applied to a project?
A. PO numbers
B. Cost baseline
C. Bill of materials
D. WBS codes
Question # 38
A new project manager is working in an environment where resources report to another supervisor. The project manager is having difficulty with a particular member and wants to escalate the issue. Which of the following documents should the project manager consult?
A. Issue log
B. RACI chart
C. Risk management plan
D. Organizational chart
Question # 39
Which of the following will identify the MOST potential project risks?
A. Cost-benefit analysis
B. Past project documentation
C. Project budget
D. Benchmarking
Question # 40
A project team is spread between two countries on different continents. Which of the following factors are MOST likely to influence communication methods selected for the communication plan? (Select TWO).
A. Interorganizational constraints
B. Personal preferences
C. Language barriers
D. Cultural differences
E. Confidentiality constraints
Question # 41
An engineer is troubleshooting a malfunctioning physical deliverable and requires assistance from remote team members. Which of the following would be the BEST communication method for the engineer to use?
A. Phone conversation
B. Face-to-face meeting
C. Instant messaging
D. Video conference
Question # 42
A key stakeholder asked several members of the project team to make project changes without submitting them for approval. Because the stakeholder is related to the Chief Executive Officer (CEO), the team members are reluctant to deny these requests. Which of the following should the project manager do FIRST to control this situation?
A. Have the team members deny all change requests from this stakeholder
B. Ask the project sponsor for more funding to anticipate the change requests from the key stakeholder
C. Contact the key stakeholder to encourage the submission of written change requests
D. Request additional resources from the project team to complete the change requests from the key stakeholder
Question # 43
A part that is needed to complete Task 3 has been backordered and will arrive three days later than scheduled. Task 3 must be complete for Task 4 to start. There is one day of float for the two tasks. Which of the following represents the number of days the project schedule will be delayed?
A. Zero
B. One
C. Two
D. Three
Question # 44
A project manager is performing resource leveling and notices one of the functional testers is assigned 40% in a second project. The project manager needs the resource to be 100% dedicated to the project; otherwise, the testing phase jeopardizes the delivery date. Which of the following should the project manager do NEXT?
A. Ask the resource manager to deallocate the resource from the second project.
B. Ask the resource manager to assign a new resource with 40% of allocation.
C. Keep the resource 100% allocated in the project, as per the initial plan.
D. Change the resource to 60% of allocation and review the mitigation plan.
Question # 45
A project can be defined as:
A. permanent and ongoing.
B. temporary and unique.
C. temporary and standard.
D. permanent and unique.
Question # 46
A project sponsor wants to know which tasks are next in the project but is unable to find this information. Which of the following may need to be adjusted?
A. Scope document
B. Status report
C. Issue log
D. Risk log
Question # 47
Which of the following charts would indicate the cause and effect of tasks in a project, and for which of the following activities would the chart be used?
A. Histogram, forecasting
B. Ishikawa, quality control
C. Scatter, determining resources
D. Gantt, leveraging resources
Question # 48
Which of the following are major characteristics of sprint planning? (Choose two.)
A. Defining the sprint durations
B. Defining the sprint owners
C. Defining the sprint parameters
D. Defining the number of sprints
E. Defining the sprint classifications
Question # 49
While planning a project, the project team estimates known expenses but also applies a margin of error for unknown expenses. Which of the following is the project team trying to determine?
A. Cost of quality
B. Expenditures
C. Total project cost
D. Burn rate
Question # 50
A member of a CCB notices a change request was not approved by the steering committee. Which of the following is the BEST method to handle this situation?
A. Disapprove the change request.
B. Evaluate the impact of the change.
C. Develop a regression plan.
D. Hold the change request for review
Question # 51
The project team has identified all the tasks needed to create project deliverables and grouped them into work packages covering all project scope. Which of the following should be done NEXT?
A. Identify task relationships.
B. Put the resources on tasks.
C. Set the quality gates.
D. Estimate the work package.
Question # 52
Which of the following includes setting governance gates as well as predecessors and dependencies?
A. Project communication
B. Project constraints
C. Project change control
D. Project scheduling
Question # 53
In the review of a project status report, the slack is negative. Which of the following should the project manager tell the stakeholders?
A. The project is behind schedule
B. The project is over budget
C. The project has float available
D. The project needs a gate review
Question # 54
A construction company is building a plant in a territory that is prone to earthquakes. To address the risk and consequences of potential earthquakes during and after plant construction, the company purchases additional insurance. Which of the following risk responses has occurred?
A. Avoiding
B. Mitigating
C. Accepting
D. Transferring
Question # 55
A new executive has joined the organization and is considering adding deliverables to the scope. The sponsor agrees with the executive but does not want to change the completion date. Which of the following options would be MOST useful to the project manager to accommodate the new scope without extending the completion date? (Choose two.)
A. Fast-track some tasks to free up time.
B. Remove some of the previous deliverables.
C. Document the impact to the scope.
D. Request additional funds to get more resources.
E. Deny the scope change.
F. Perform regression analysis on the changes.
Question # 56
A company recently discovered that it could save money by moving its call center to another country. The company entered into an agreement for call center services. Which of the following types of organizational change is this?
A. Relocation
B. Outsourcing
C. Business process change
D. Business demerger/split
Question # 57
A project manager has updated the project schedule but cannot analyze the schedule performance. Which of the following steps did the project manager miss?
A. Lock the schedule
B. Approve the schedule
C. Baseline the schedule
D. Fast track the schedule
Question # 58
According to the communication management plan, the project scheduler is required to post weekly status reports on the project’s intranet site. From the stakeholders’ point of view, accessing the weekly report is an example of:
A. interorganizational preferences
B. personal preferences
C. the interactive method
D. the pull method
Question # 59
A project manager is reviewing project performance. Which of the following would be the BEST indicator of the total project cost?
A. AC
B. EAC
C. CPI
D. ETC
Question # 60
Task A starts on Day 1 and has a duration of two days. Task B has a duration of two days and starts on Day 3. Task C starts after Task A and has a duration of three days. Task D starts after Task B and Task C and has a duration of one day. Which of the following represents the critical path?
A. Five days
B. Six days
C. Seven days
D. Eight days
Question # 61
The PMO is confused by an entry in the risk register and would like the project manager to provide clarification regarding strategy. Based on the following entry: Which of the following should be modified to BEST eliminate confusion?
A. Change the status to issue and include it in the issue log
B. Change the strategy to mitigate
C. Change the name to identify the problem clearly
D. Change the owner to sponsor
Question # 62
Which of the following conflict resolution techniques relies on establishing areas of agreement rather than disagreement?
A. Smoothing
B. Collaborating
C. Compromising
D. Avoiding
Testimonials
chintanThis exam was a big challenge for me but Dumps4download motivated me and gave me confident to seal with it. Everything was so simple that after preparation I found everything so easy related to PK0-004 exam. Now I can say nothing is difficult just what you need is the right thing at the right time.
ibeepJust to take an exam is not enough. Planning to pass that exam is also necessary. So use Dumps4download PK0-004 study Guide to get your task done properly. It is my experience that I always faced a failure whenever I started my journey without any preplanning. Same thing is for exam. Plan to success is necessary that asks for Dumps4download.
VishalDumps4download PK0-004 study Guide has been a useful for candidates of all levels. I did not have much interest in reading but this series motivated me because of its easy to understand writing style. Dumps4downloadare doing a great job.
vickyThis exam is not so difficult as it looks like if you take help from the provided material by Dumps4download for your sure success. I also took PK0-004 as a very difficult task but their study guide made it easy for me and now I have passed the exam successfully.
woByqXdmRLCaQsHI normally don't comment about things but PK0-004 Dumps4download did so good to me that it compelled me to write a comment over there page. They are doing a crazy work to help the students just like some others but they are unique.